CAISO node intelligence

WINDHUB SUBSTATION

KERN (CA) · SCE · node key WINDHUB · CAISO run date 2026-10-12

Seven questions a developer, lender or counsel asks before filing here. Every figure is a CAISO row; Not public marks what the public files cannot answer and where to get it. Definitions: methodology.

Can you get in?

No official Cluster 16 availability statement names this POI. Absence of a statement is not availability.

Not public: per-constraint transmission headroom at this POI — CAISO's cluster study reports (RIMS login).
Not on this site yet: the zonal transmission-capability table CAISO publishes for cluster scoring — public; the join is planned.

Who is ahead of you?

4,600 MW (n=9)
queued ahead of a new request (legacy + C15)
3,700 MW (n=7)
with an executed interconnection agreement · public report; C15 has no IA yet
2,268 MW (n=6)
operating at this node
0 MW
Cluster 15 requests seeking full capacity
Already operating within 5 km (EIA-860): 24 plants; 1,976 MW nameplate; 256 MW / 793 MWh storage (77 MW of it at units reporting one hour or less; duration not established for those); oldest unit 1982; 26 MW proposed. Technology: Onshore Wind Turbine 1,680; Batteries 256; Solar Photovoltaic 40. Operators: AES Distributed Energy; Alta Wind II, LLC; Alta Wind III, LLC; Alta Wind IV, LLC; Alta Wind V, LLC; Coram California Development, L.P. …. Owners: Brookfield Renewable Energy Group; CTV Marketing Group; Coram Energy, LLC; Excelsior Energy Capital; NRG Renew; TPC Windfarm LLC. LMP nodes reported by these generators: POD_RTREE_2_WIND3-APND; SUNSPTA_7_N002. Joined by distance to this node's mapped position, not by point of interconnection: a plant on a long gen-tie lands on the nearest substation. Corporate names from a federal filing.
Not public: who the interconnection customers are (the queue) — CAISO's public files carry project names only; the projects table below is the full public record. EIA-860 names the owners of what already operates nearby, not of what is queued.

Do projects leave after seeing the costs?

7,568 MW (n=18)
received Phase II / Facilities Study results here · any sheet, public report
1,250 MW (n=4)
of that, withdrew with results in hand
0.17 (n=18)
Phase II attrition (MW share)
Not public: the network upgrade cost allocated to a project here — Phase I / Phase II study reports, served through RIMS. Ask the incumbent developer or request the report; nothing public reconstructs it.

Will you be deliverable?

150 MW (n=1)
2025 TPD requested at this node
0 MW
allocated
150 MW
refused at 0 % — contracted / shortlisted (groups A+B)
0 MW
refused at 0 % — no PPA (group D)
0 / 0
2024 cycle: projects given full / partial capacity

A 0 % in group D is the expected result for an uncontracted project; a 0 % in group A or B is a contracted project that did not get deliverability. Rows are joined through all three sheets, so a request whose project has since withdrawn still appears. CAISO states no reason.

Will the power be worth anything here?

The Local Capacity Technical Report does not name this substation on any area boundary: not encoded, which is not the same as outside every area.

Not on this site yet: day-ahead price history at this POI — CAISO OASIS publishes it; it is shown only for a pricing node confirmed by hand in data/poi_pnodes.csv, and this one is not confirmed yet.

Will the land pass intake?

Intake scoring under the 2023 IPE rewards site control, permitting progress and system need before study begins. Parcel, zoning, Williamson Act and CEC exclusion screens run for Kings and Kern counties (caiso-siting parcels, layers screen); results are in outputs/parcels_*.md for the nodes they were run on and are not yet rendered per node here.

Not public: landowner willingness and option terms — county assessor parcels give ownership class, not intent; owner names are withheld on purpose.

How long, and who gave up?

1,450 MW (n=3)
withdrawn since 2022 (both reports)
1,000 MW
of that, storage
0.34 (n=18)
storage churn · withdrawn storage ÷ queued + operating storage
0.55 (n=2)
Cluster 15 survival · active ÷ (active + withdrawn)
11,044 MW (n=33)
all-time withdrawn since 2006 · mostly wind/solar-era; colour, not signal
2025-08-01 to 2033-02-26
current on-line dates of active projects

Cluster-level time-to-withdrawal curves are on the Survival page; they compare process regimes, not only nodes.

Projects at this node (48)

Both reports. cod = current on-line date (public report) or proposed on-line date (Cluster 15). ia_status exists only in the public report. Cluster 15 deliverability is requested, not allocated.

project_namequeue_positionsheet_statusclusternet_mwstorage_mwdeliverabilityia_statuscodwithdrawn_date
SANBORN HYBRID 31632ACTIVEC121,400672PARTIAL CAPACITYEXECUTED2026-12-31
SANBORN 5 HYBRID1791ACTIVEC135500ENERGY ONLYEXECUTED2028-04-01
Soledad Solar2311ACTIVEC155500ENERGY ONLY (REQ)2028-06-01
BELLEFIELD SOLAR FARM1510ACTIVEC11500500FULL CAPACITYEXECUTED2025-08-01
SANBORN SOLAR 21518ACTIVEC11500372FULL CAPACITYEXECUTED2025-10-01
BELLEFIELD 2 SOLAR FARM1631ACTIVEC12500500FULL CAPACITYEXECUTED2027-06-30
SOLEIL CANTIL2078ACTIVEC14350225ENERGY ONLY2033-02-26
BELLEFIELD 3 SOLAR FARM1779ACTIVEC13150150ENERGY ONLYEXECUTED2028-02-27
SANBORN HYBRID 41790ACTIVEC1310050ENERGY ONLYEXECUTED2025-10-01
CPC EAST95COMPLETEDSERIAL LGIP5500EXECUTED
VOYAGER WIND 2119COMPLETEDSERIAL LGIP5000FULL CAPACITYEXECUTED
EDSAN 21424COMPLETEDC10500196FULL CAPACITYEXECUTED
EDSAN 11324COMPLETEDC09300266FULL CAPACITYEXECUTED
VOYAGER WIND93COMPLETEDSERIAL LGIP2200FULL CAPACITYEXECUTED
RISING TREE WIND FARM (FKA HOMESTEAD WIND FARM)188COMPLETEDTC1980FULL CAPACITYEXECUTED
PV-47363WITHDRAWNSERIAL LGIP70002011-05-012010-07-12
PV-48364WITHDRAWNSERIAL LGIP70002013-05-012008-11-21
PV-49400WITHDRAWNSERIAL LGIP70002011-05-012008-07-22
CALIFORNIA CITY SOLAR1320WITHDRAWNC097000FULL CAPACITY2020-12-312017-05-02
GOLDEN HILLS POWER926WITHDRAWNC055500FULL CAPACITY2018-08-062014-03-20
DESERT SAPPHIRE PV182WITHDRAWNSERIAL LGIP50002015-07-012009-12-07
AVALON II438WITHDRAWNSERIAL LGIP50002011-12-312008-11-26
BELLEFIELD SOLAR 42065WITHDRAWNC14500500FULL CAPACITY2025-07-312023-01-30
BISON PEAK2086WITHDRAWNC14500500FULL CAPACITY2025-12-312023-02-08
FRV EAFB SOLAR571WITHDRAWNC024500FULL CAPACITY2013-12-312011-02-15
Torbino Solar2329WITHDRAWNC154500ENERGY ONLY (REQ)2029-03-302026-07-01
CREOSOTE1418WITHDRAWNC104000FULL CAPACITY2021-08-012018-02-22
YEAGER HYBRID SOLAR1635WITHDRAWNC12400400FULL CAPACITY2022-11-302020-03-13
LONGHORN 11786WITHDRAWNC13400400FULL CAPACITY2024-09-302021-03-11
WEST MOJAVE ENERGY492WITHDRAWNC013500FULL CAPACITY2015-12-012009-11-02
TENASKA MOUNTAIN BASIN938WITHDRAWNC053000FULL CAPACITY2016-06-012012-06-15
CANELLA SOLAR FARM1331WITHDRAWNC09300300FULL CAPACITY2021-10-012018-04-16
LOOP RANCH WIND722WITHDRAWNC042990FULL CAPACITY2013-12-312012-01-03
WILLOW SPRINGS SOLAR GENERATING STATION II332WITHDRAWNSERIAL LGIP26402011-09-012008-11-26
FLYING WING SOLAR (FKA GENESIS SOLAR)154WITHDRAWNTC2500FULL CAPACITY2015-06-012013-04-18
ALTA 20 WIND1778WITHDRAWNC132500FULL CAPACITY2025-12-152021-03-10
WILLOW SPRINGS SOLAR GENERATING STATION331WITHDRAWNSERIAL LGIP23102010-05-012008-11-26
MOJAVE VIEW SOLAR732WITHDRAWNC042000FULL CAPACITY2013-12-312012-03-12
CANELLA 2 SOLAR FARM1420WITHDRAWNC10200200FULL CAPACITY2020-10-012018-04-16
GARCES HYBRID SOLAR1634WITHDRAWNC12200200FULL CAPACITY2022-11-302019-07-23
ORO VERDE SOLAR PROJECT (FKA GATEWAY SOLAR ENERGY PROJECT)494WITHDRAWNC011500FULL CAPACITY2016-10-012015-01-13
SANBORN SOLAR912WITHDRAWNC051500FULL CAPACITY2015-01-012012-06-20
ALTA 1 STORAGE2074WITHDRAWNC14150150FULL CAPACITY2024-04-012021-09-10
DESERT FLOWER WIND FARM1633WITHDRAWNC12850FULL CAPACITY2023-12-312019-11-07
VOYAGER SOLAR ENERGY643QWITHDRAWNC03800FULL CAPACITY2014-11-012010-11-23
HIGHWAY 58 SOLAR ENERGY PROJECT786WITHDRAWNC04800FULL CAPACITY2014-12-012012-02-29
OAK CREEK SOLAR I843WITHDRAWNC04350FULL CAPACITY2013-12-012012-03-26
TEHACHAPI SPINDLE925WITHDRAWNC052020FULL CAPACITY2014-09-302013-05-10

TPD allocation requests at this node (1)

CAISO Transmission Plan Deliverability allocation results, joined on queue position through all three sheets of the public report (a request whose project has since withdrawn still appears). 2024 rows carry no MW. Groups: A = executed power purchase agreement requiring FCDS, or an LSE serving its own load; B = shortlisted for, or actively negotiating, a power purchase agreement; C = already in commercial operation for the capacity seeking TP deliverability; D = no PPA; electing the Section 8.9.2.3 (financial-security) path.

tpd_yearqueue_idproject_nameallocation_groupmw_requestedallocation_pctmw_allocatedstatus
20251779BELLEFIELD 3 SOLAR FARMB1500%0NONE

Geocode provenance

geo_method
exact
geo_score
1.00
osm_name
Windhub Substation
lat, lon
35.03499, -118.28086

All metrics

metricvaluedefinition
legacy_active_mw4,050active MW in the public report (C14 and earlier)
c15_active_mw550active MW in the Cluster 15 report
operating_mw2,268completed MW in the public report
pipeline_storage_mw2,470storage MW inside legacy_active_mw + c15_active_mw
operating_storage_mw462storage MW inside operating_mw (completed, public report)
wd_recent_mw1,450withdrawn in the last 5 years (both reports)
wd_recent_storage_mw1,000storage MW of those rows — each project's storage components capped at its net-to-grid figure; a handful of filings report net-to-grid as 0 and keep the component MW, so this can exceed the row above at 3 nodes.
wd_post_phase2_mw1,250withdrew AFTER Phase II / Facilities Study results (public report only)
p2_reached_mw7,568MW of projects that received Phase II / Facilities Study results here (public report, any sheet)
p2_withdrawn_mw1,250of those, MW that then withdrew (== wd_post_phase2_mw)
p2_attrition0.17p2_withdrawn_mw / p2_reached_mw — share of studied MW that left with results in hand
committed_mw3,700ACTIVE MW holding an executed interconnection agreement (public report)
churn_n18projects behind storage_churn (withdrawn recent + queued + operating)
c15_n2projects behind c15_survival
p2_n18projects behind p2_attrition
eia_plants24operable EIA-860 plants within 5 km of the node's mapped position (positioned nodes only)
eia_nameplate_mw1,976their nameplate MW, all technologies (EIA-860 Generator file, Operable sheet)
eia_storage_mwh793battery energy capacity among them (EIA-860 Energy Storage file), as reported
eia_storage_1h_mw77storage MW at units whose reported MWh is no more than their MW (one hour or less); shown with 'duration not established' because the value may reflect how the form was filled
eia_proposed_mw26nameplate MW in EIA-860's Proposed sheet within the same radius (planned / under construction)
wd_alltime_mw11,044every withdrawn MW since 2006 (includes dead wind/solar-era projects)
storage_churn0.34wd_recent_storage_mw / (active + operating storage MW) — the one to quote
churn_alltime1.61wd_alltime_mw / (pipeline + operating MW) — historical color only
c15_survival0.55c15_active / (c15_active + c15_withdrawn)
c15_fcds_req_mw0C15 active MW that requested Full Capacity Deliverability Status (requested, not allocated)
tpd25_projects1projects at the node that sought TPD in CAISO's 2025 allocation cycle
tpd25_req_mw150MW at the node that sought TPD in CAISO's 2025 allocation cycle
tpd25_alloc_mw0MW allocated in that cycle (requested × allocation %)
tpd25_denied_mw150MW requested by rows that received 0 %
tpd25_unalloc_mw150requested minus allocated: MW refused outright PLUS the remainder left by partial allocations — quote this for 'what the developer did not get'
tpd25_unknown_mw0MW requested by rows with no allocation percentage in the file; 0 today
tpd25_req_A_mw0of tpd25_req_mw, requested in allocation group A: executed PPA (or LSE own load)
tpd25_req_B_mw150of tpd25_req_mw, requested in allocation group B: shortlisted / negotiating a PPA
tpd25_req_C_mw0of tpd25_req_mw, requested in allocation group C: already in commercial operation
tpd25_req_D_mw0of tpd25_req_mw, requested in allocation group D: no PPA, Section 8.9.2.3 path
tpd25_denied_A_mw0of tpd25_denied_mw, refused at 0 % in group A
tpd25_denied_B_mw150of tpd25_denied_mw, refused at 0 % in group B
tpd25_denied_C_mw0of tpd25_denied_mw, refused at 0 % in group C
tpd25_denied_D_mw0of tpd25_denied_mw, refused at 0 % in group D
tpd25_denied_ppa_mw150refused MW in groups A + B: contracted or shortlisted projects that did not get deliverability; the refusal that matters
tpd24_fcdsa_projects0projects at the node allocated Full Capacity in the 2024 cycle
lcr_statusCAISO Local Capacity Area (Resource Adequacy geography): 'in <area>' or 'outside <area>' as the LCT report's boundary lists state it; blank = not encoded, never 'outside every area'
lcr_sub_areasub-area / load pocket within that area, when the LCT report delineates it
wdat_active_projects0active WDAT requests at the same substation (WDAT = distribution-level queue at the same substation, PG&E file today; not CAISO deliverability)
wdat_active_mw0MW of active WDAT (distribution-level) requests at the same substation (PG&E file today)
wdat_active_storage_mw0storage MW attributed from wdat_active_mw — an assumption: the PG&E file publishes one MW figure per request, so storage-only requests count in full and solar+storage requests count at half (160 of 1,011 active requests carry storage; 362 of their 479 MW is attributed as storage).
wdat_inservice_mw0WDAT MW already in service at that substation
wdat_withdrawn_mw0WDAT MW withdrawn at that substation (all-time in the file)
wdat_ft_over_cap_n0active Fast Track requests above the 5 MW Fast Track ceiling — held out of wdat_active_*
wdat_ft_over_cap_mw0MW of those held-out rows, as posted; cause not established

No figure on this site states a cause. CAISO files carry no withdrawal reason beyond "IC Request".

Screening tool, not engineering advice. Built from public filings by an engineer who is not a licensed PE. Verify every figure against the source filing named in its row before you rely on it for any decision. No warranty of any kind. Not affiliated with CAISO, EIA, or any utility. No engineering services are offered.