TROUT CANYON SUBSTATION
CLARK (NV) ·
GLW · node key TROUT CANYON · CAISO run date 2026-10-12
Seven questions a developer, lender or counsel asks before filing here. Every figure is a CAISO row; Not public marks what the public files cannot answer and where to get it. Definitions: methodology.
Can you get in?
No official Cluster 16 availability statement names this POI. Absence of a statement is not availability.
Who is ahead of you?
Do projects leave after seeing the costs?
Will you be deliverable?
A 0 % in group D is the expected result for an uncontracted project; a 0 % in group A or B is a contracted project that did not get deliverability. Rows are joined through all three sheets, so a request whose project has since withdrawn still appears. CAISO states no reason.
Will the power be worth anything here?
The Local Capacity Technical Report does not name this substation on any area boundary: not encoded, which is not the same as outside every area.
Will the land pass intake?
Intake scoring under the 2023 IPE rewards site control, permitting progress and system need before study begins. Parcel, zoning, Williamson Act and CEC exclusion screens run for Kings and Kern counties (caiso-siting parcels, layers screen); results are in outputs/parcels_*.md for the nodes they were run on and are not yet rendered per node here.
How long, and who gave up?
Cluster-level time-to-withdrawal curves are on the Survival page; they compare process regimes, not only nodes.
Projects at this node (12)
Both reports. cod = current on-line date (public report) or proposed on-line date (Cluster 15). ia_status exists only in the public report. Cluster 15 deliverability is requested, not allocated.
| project_name | queue_position | sheet_status | cluster | net_mw | storage_mw | deliverability | ia_status | cod | withdrawn_date |
|---|---|---|---|---|---|---|---|---|---|
| MOSEY | 2148 | ACTIVE | C14 | 500 | 500 | FULL CAPACITY | EXECUTED | 2029-06-27 | |
| SUNBAKED SOLAR | 2149 | ACTIVE | C14 | 500 | 500 | ENERGY ONLY | EXECUTED | 2029-02-26 | |
| BONANZA PEAK SOLAR FARM | 1655 | ACTIVE | C12 | 400 | 200 | FULL CAPACITY | EXECUTED | 2027-12-31 | |
| PURPLE SAGE ENERGY CENTER | 1800 | ACTIVE | C13 | 400 | 400 | FULL CAPACITY | EXECUTED | 2028-05-01 | |
| LARREA SOLAR | 2150 | ACTIVE | C14 | 300 | 300 | ENERGY ONLY | 2028-09-15 | ||
| YELLOW PINE 3 | 1654 | ACTIVE | C12 | 250 | 236 | PARTIAL CAPACITY | EXECUTED | 2026-12-01 | |
| CALVADA SPRINGS SOLAR | 1798 | ACTIVE | C13 | 250 | 250 | PARTIAL CAPACITY | EXECUTED | 2027-12-31 | |
| ROUGH HAT HYBRID SOLAR | 1650 | ACTIVE | C12 | 200 | 200 | FULL CAPACITY | EXECUTED | 2028-12-13 | |
| ROUGH HAT 2 | 1799 | ACTIVE | C13 | 200 | 200 | FULL CAPACITY | EXECUTED | 2028-12-13 | |
| Borderline Solar | 2242 | WITHDRAWN | C15 | 600 | 600 | ENERGY ONLY (REQ) | 2028-10-01 | 2025-05-01 | |
| Campito Peak | 2211 | WITHDRAWN | C15 | 550 | 550 | FULL CAPACITY (REQ) | 2031-12-01 | 2025-04-28 | |
| Cathedral | 2309 | WITHDRAWN | C15 | 350 | 350 | FULL CAPACITY (REQ) | 2031-12-02 | 2025-04-29 |
TPD allocation requests at this node (4)
CAISO Transmission Plan Deliverability allocation results, joined on queue position through all three sheets of the public report (a request whose project has since withdrawn still appears). 2024 rows carry no MW. Groups: A = executed power purchase agreement requiring FCDS, or an LSE serving its own load; B = shortlisted for, or actively negotiating, a power purchase agreement; C = already in commercial operation for the capacity seeking TP deliverability; D = no PPA; electing the Section 8.9.2.3 (financial-security) path.
| tpd_year | queue_id | project_name | allocation_group | mw_requested | allocation_pct | mw_allocated | status |
|---|---|---|---|---|---|---|---|
| 2025 | 2150 | LARREA SOLAR | A | 125 | 0% | 0 | NONE |
| 2025 | 2149 | SUNBAKED SOLAR | B | 100 | 0% | 0 | NONE |
| 2025 | 2149 | SUNBAKED SOLAR | B | 400 | 0% | 0 | NONE |
| 2024 | 2148 | MOSEY | A | 100% | FCDSA |
Geocode provenance
Position is approximate or unknown (county-centroid): position unknown; placed at the median of located nodes in the county.
- geo_method
- county-centroid
- geo_score
- 0.30
- osm_name
- median of located nodes in NV CLARK
- lat, lon
- 35.79734, -115.01155
All metrics
| metric | value | definition |
|---|---|---|
legacy_active_mw | 3,000 | active MW in the public report (C14 and earlier) |
c15_active_mw | 0 | active MW in the Cluster 15 report |
operating_mw | 0 | completed MW in the public report |
pipeline_storage_mw | 2,786 | storage MW inside legacy_active_mw + c15_active_mw |
operating_storage_mw | 0 | storage MW inside operating_mw (completed, public report) |
wd_recent_mw | 1,500 | withdrawn in the last 5 years (both reports) |
wd_recent_storage_mw | 1,500 | storage MW of those rows — each project's storage components capped at its net-to-grid figure; a handful of filings report net-to-grid as 0 and keep the component MW, so this can exceed the row above at 3 nodes. |
wd_post_phase2_mw | 0 | withdrew AFTER Phase II / Facilities Study results (public report only) |
p2_reached_mw | 3,000 | MW of projects that received Phase II / Facilities Study results here (public report, any sheet) |
p2_withdrawn_mw | 0 | of those, MW that then withdrew (== wd_post_phase2_mw) |
p2_attrition | 0.00 | p2_withdrawn_mw / p2_reached_mw — share of studied MW that left with results in hand |
committed_mw | 2,700 | ACTIVE MW holding an executed interconnection agreement (public report) |
churn_n | 12 | projects behind storage_churn (withdrawn recent + queued + operating) |
c15_n | 3 | projects behind c15_survival |
p2_n | 9 | projects behind p2_attrition |
eia_plants | 0 | operable EIA-860 plants within 5 km of the node's mapped position (positioned nodes only) |
eia_nameplate_mw | 0 | their nameplate MW, all technologies (EIA-860 Generator file, Operable sheet) |
eia_storage_mwh | 0 | battery energy capacity among them (EIA-860 Energy Storage file), as reported |
eia_storage_1h_mw | storage MW at units whose reported MWh is no more than their MW (one hour or less); shown with 'duration not established' because the value may reflect how the form was filled | |
eia_proposed_mw | 0 | nameplate MW in EIA-860's Proposed sheet within the same radius (planned / under construction) |
wd_alltime_mw | 1,500 | every withdrawn MW since 2006 (includes dead wind/solar-era projects) |
storage_churn | 0.54 | wd_recent_storage_mw / (active + operating storage MW) — the one to quote |
churn_alltime | 0.50 | wd_alltime_mw / (pipeline + operating MW) — historical color only |
c15_survival | 0.00 | c15_active / (c15_active + c15_withdrawn) |
c15_fcds_req_mw | 0 | C15 active MW that requested Full Capacity Deliverability Status (requested, not allocated) |
tpd25_projects | 2 | projects at the node that sought TPD in CAISO's 2025 allocation cycle |
tpd25_req_mw | 625 | MW at the node that sought TPD in CAISO's 2025 allocation cycle |
tpd25_alloc_mw | 0 | MW allocated in that cycle (requested × allocation %) |
tpd25_denied_mw | 625 | MW requested by rows that received 0 % |
tpd25_unalloc_mw | 625 | requested minus allocated: MW refused outright PLUS the remainder left by partial allocations — quote this for 'what the developer did not get' |
tpd25_unknown_mw | 0 | MW requested by rows with no allocation percentage in the file; 0 today |
tpd25_req_A_mw | 125 | of tpd25_req_mw, requested in allocation group A: executed PPA (or LSE own load) |
tpd25_req_B_mw | 500 | of tpd25_req_mw, requested in allocation group B: shortlisted / negotiating a PPA |
tpd25_req_C_mw | 0 | of tpd25_req_mw, requested in allocation group C: already in commercial operation |
tpd25_req_D_mw | 0 | of tpd25_req_mw, requested in allocation group D: no PPA, Section 8.9.2.3 path |
tpd25_denied_A_mw | 125 | of tpd25_denied_mw, refused at 0 % in group A |
tpd25_denied_B_mw | 500 | of tpd25_denied_mw, refused at 0 % in group B |
tpd25_denied_C_mw | 0 | of tpd25_denied_mw, refused at 0 % in group C |
tpd25_denied_D_mw | 0 | of tpd25_denied_mw, refused at 0 % in group D |
tpd25_denied_ppa_mw | 625 | refused MW in groups A + B: contracted or shortlisted projects that did not get deliverability; the refusal that matters |
tpd24_fcdsa_projects | 1 | projects at the node allocated Full Capacity in the 2024 cycle |
lcr_status | CAISO Local Capacity Area (Resource Adequacy geography): 'in <area>' or 'outside <area>' as the LCT report's boundary lists state it; blank = not encoded, never 'outside every area' | |
lcr_sub_area | sub-area / load pocket within that area, when the LCT report delineates it | |
wdat_active_projects | 0 | active WDAT requests at the same substation (WDAT = distribution-level queue at the same substation, PG&E file today; not CAISO deliverability) |
wdat_active_mw | 0 | MW of active WDAT (distribution-level) requests at the same substation (PG&E file today) |
wdat_active_storage_mw | 0 | storage MW attributed from wdat_active_mw — an assumption: the PG&E file publishes one MW figure per request, so storage-only requests count in full and solar+storage requests count at half (160 of 1,011 active requests carry storage; 362 of their 479 MW is attributed as storage). |
wdat_inservice_mw | 0 | WDAT MW already in service at that substation |
wdat_withdrawn_mw | 0 | WDAT MW withdrawn at that substation (all-time in the file) |
wdat_ft_over_cap_n | 0 | active Fast Track requests above the 5 MW Fast Track ceiling — held out of wdat_active_* |
wdat_ft_over_cap_mw | 0 | MW of those held-out rows, as posted; cause not established |
No figure on this site states a cause. CAISO files carry no withdrawal reason beyond "IC Request".
Screening tool, not engineering advice. Built from public filings by an engineer who is not a licensed PE. Verify every figure against the source filing named in its row before you rely on it for any decision. No warranty of any kind. Not affiliated with CAISO, EIA, or any utility. No engineering services are offered.