GATES SUBSTATION

FRESNO (CA) · PGAE · node key GATES · CAISO run date 2026-10-12

Seven questions a developer, lender or counsel asks before filing here. Every figure is a CAISO row; Not public marks what the public files cannot answer and where to get it. Definitions: methodology.

Can you get in?

Official Cluster 16 POI statement: RELIEVED — 500 kV removed from Table G2-A space limitation per revised plan [2026-01-15]
Not public: per-constraint transmission headroom at this POI — CAISO's cluster study reports (RIMS login).
Not on this site yet: the zonal transmission-capability table CAISO publishes for cluster scoring — public; the join is planned.

Who is ahead of you?

2,521 MW (n=7)
queued ahead of a new request (legacy + C15)
1,521 MW (n=6)
with an executed interconnection agreement · public report; C15 has no IA yet
820 MW (n=5)
operating at this node
0 MW
Cluster 15 requests seeking full capacity
Already operating within 5 km (EIA-860): 4 plants; 335 MW nameplate; 137 MW storage (EIA reports 137 MWh, i.e. one hour or less — this may reflect how the form was filled; duration not established); oldest unit 2013; 300 MW proposed. Technology: Solar Photovoltaic 198; Batteries 137. Operators: Boralex US Operations LLC; Pacific Gas & Electric Co.; RWE Clean Energy. Owners: Boralex WSF Holdings LLC; CRE WSF Holdings II LLC; GSPPR LLC; 1 individual owner not named. LMP nodes reported by these generators: FIFTHS_2_FSSR1; GATESBK4_7_N002; GATESBK4_7_N003; Q633C1_7_N001. Joined by distance to this node's mapped position, not by point of interconnection: a plant on a long gen-tie lands on the nearest substation. Corporate names from a federal filing.
Not public: who the interconnection customers are (the queue) — CAISO's public files carry project names only; the projects table below is the full public record. EIA-860 names the owners of what already operates nearby, not of what is queued.

Do projects leave after seeing the costs?

4,581 MW (n=15)
received Phase II / Facilities Study results here · any sheet, public report
1,240 MW (n=3)
of that, withdrew with results in hand
0.27 (n=15)
Phase II attrition (MW share)
Not public: the network upgrade cost allocated to a project here — Phase I / Phase II study reports, served through RIMS. Ask the incumbent developer or request the report; nothing public reconstructs it.

Will you be deliverable?

1,396 MW (n=2)
2025 TPD requested at this node
396 MW
allocated
0 MW
refused at 0 % — contracted / shortlisted (groups A+B)
1,000 MW
refused at 0 % — no PPA (group D)
2 / 0
2024 cycle: projects given full / partial capacity

A 0 % in group D is the expected result for an uncontracted project; a 0 % in group A or B is a contracted project that did not get deliverability. Rows are joined through all three sheets, so a request whose project has since withdrawn still appears. CAISO states no reason.

Will the power be worth anything here?

Outside Greater Fresno local area boundary — Gates 230 kV (and the 500 kV yard) is out of Greater Fresno; only the Gates 70 kV bus is in Final 2027 LCT Report [2026-04-29]
Not on this site yet: day-ahead price history at this POI — CAISO OASIS publishes it; it is shown only for a pricing node confirmed by hand in data/poi_pnodes.csv, and this one is not confirmed yet.

Will the land pass intake?

Intake scoring under the 2023 IPE rewards site control, permitting progress and system need before study begins. Parcel, zoning, Williamson Act and CEC exclusion screens run for Kings and Kern counties (caiso-siting parcels, layers screen); results are in outputs/parcels_*.md for the nodes they were run on and are not yet rendered per node here.

Not public: landowner willingness and option terms — county assessor parcels give ownership class, not intent; owner names are withheld on purpose.

How long, and who gave up?

839 MW (n=4)
withdrawn since 2022 (both reports)
839 MW
of that, storage
0.36 (n=16)
storage churn · withdrawn storage ÷ queued + operating storage
0.00 (n=2)
Cluster 15 survival · active ÷ (active + withdrawn)
5,233 MW (n=18)
all-time withdrawn since 2006 · mostly wind/solar-era; colour, not signal
2026-10-01 to 2031-03-19
current on-line dates of active projects

Cluster-level time-to-withdrawal curves are on the Survival page; they compare process regimes, not only nodes.

Projects at this node (30)

Both reports. cod = current on-line date (public report) or proposed on-line date (Cluster 15). ia_status exists only in the public report. Cluster 15 deliverability is requested, not allocated.

project_namequeue_positionsheet_statusclusternet_mwstorage_mwdeliverabilityia_statuscodwithdrawn_date
PLUM1968ACTIVEC141,000520ENERGY ONLY2031-03-19
LOCK STORAGE1962ACTIVEC14500500FULL CAPACITYEXECUTED2027-12-15
KEY STORAGE 11479ACTIVEC11300300FULL CAPACITYEXECUTED2026-10-01
POMEGRANATE1243ACTIVEC09250225FULL CAPACITYEXECUTED2027-12-31
PLUOT1242ACTIVEC09246154FULL CAPACITYEXECUTED2027-01-20
REDUX SOLAR1389ACTIVEC1012561FULL CAPACITYEXECUTED2028-11-30
HUASO HYBRID1954ACTIVEC14100100FULL CAPACITYEXECUTED2026-12-03
AQUAMARINE WESTSIDE1117COMPLETEDC082500FULL CAPACITYEXECUTED
WESTLANDS SOLAR BLUE1139COMPLETEDC08250225FULL CAPACITYEXECUTED
FIFTH STANDARD SOLAR954COMPLETEDC06150117PARTIAL CAPACITYEXECUTED
CHESTNUT WESTSIDE1120COMPLETEDC08150135FULL CAPACITYEXECUTED
BLACKBRIAR1027COMPLETEDC072020FULL CAPACITYEXECUTED
WSP 3835WITHDRAWNC048000FULL CAPACITY2018-02-012012-03-07
AVENAL ENERGY PROJECT10WITHDRAWNPRE- AMEND. 396200EXECUTED2009-07-01
AVENAL ENERGY PROJECT254WITHDRAWNTC6000FULL CAPACITY2017-06-012015-08-24
MADISON SOLAR724WITHDRAWNC045000FULL CAPACITY2017-12-312012-02-23
KEY STORAGE 21480WITHDRAWNC11300300FULL CAPACITY2024-12-012019-03-08
SAGEBERRY SOLAR1488WITHDRAWNC1130092FULL CAPACITY2022-12-302019-03-06
WESTLANDS LEMOORE SOLAR819WITHDRAWNC042500FULL CAPACITY2014-12-312012-03-12
Fritts2314WITHDRAWNC15250250FULL CAPACITY (REQ)2029-09-302025-11-18
ASH TREE HYBRID SOLAR1575WITHDRAWNC12200200FULL CAPACITY2022-11-302019-07-09
DRY GRAPE HYBRID SOLAR1576WITHDRAWNC12200200FULL CAPACITY2022-11-302019-07-09
COMAL FLATS 11714WITHDRAWNC13200200FULL CAPACITY2024-09-302021-03-30
TAVA FLATS1976WITHDRAWNC14200200FULL CAPACITY2024-09-302023-01-18
Superba2335WITHDRAWNC15199199FULL CAPACITY (REQ)2029-09-302025-11-18
POPPY1572WITHDRAWNC121900FULL CAPACITY2022-11-302020-04-22
NORTE VISTA1967WITHDRAWNC14190190FULL CAPACITY2024-07-312022-12-28
BETHEL 7 & 8 SOLAR THERMAL HYBRID PROJECT283WITHDRAWNSERIAL LGIP10702012-09-302011-04-12
SAN JOAQUIN 1 & 2587WITHDRAWNC021070ENERGY ONLY2012-09-302010-03-22
STONECROP1031WITHDRAWNC07200FULL CAPACITY2019-07-152016-09-19

TPD allocation requests at this node (7)

CAISO Transmission Plan Deliverability allocation results, joined on queue position through all three sheets of the public report (a request whose project has since withdrawn still appears). 2024 rows carry no MW. Groups: A = executed power purchase agreement requiring FCDS, or an LSE serving its own load; B = shortlisted for, or actively negotiating, a power purchase agreement; C = already in commercial operation for the capacity seeking TP deliverability; D = no PPA; electing the Section 8.9.2.3 (financial-security) path.

tpd_yearqueue_idproject_nameallocation_groupmw_requestedallocation_pctmw_allocatedstatus
20251242PLUOTA150100%150FCDSA
20251242PLUOTA246100%246FCDSA
20251968PLUMD7500%0NONE
20251968PLUMD2500%0NONE
20241954HUASO HYBRIDB100%FCDSA
20241962LOCK STORAGEB100%FCDSA
20241962LOCK STORAGED100%FCDSA

WDAT requests at this substation (16)

WDAT = distribution-level queue at the same substation, PG&E file today; not CAISO deliverability. WDAT requests connect below CAISO's transmission grid; they carry no CAISO deliverability unless separately studied.

queue_positionstatus_rawprocessgen_typenet_mwrequest_receivedcurrent_codia_statusft_over_cap
3155-RDActiveDGSPSolar PV52022-08-17Executed
0075-WDIn ServiceIndependent StudySolar PV202009-11-232013-06-07Executed
0120-WDIn ServiceIndependent StudySolar PV102010-04-142013-06-03Executed
0758-RDIn ServiceFast TrackSolar PV22013-05-292014-07-11Executed
0755-RDIn ServiceFast TrackSolar PV12013-05-292014-06-19Executed
0076-WDWithdrawnIndependent StudySolar PV202009-11-23Withdrawn
3746-RDWithdrawnDetailed StudySolar PV202023-11-03Withdrawn
3577-RDWithdrawnDetailed StudySolar PV82023-08-17Withdrawn
2677-RDWithdrawnDetailed StudySolar PV72020-12-16Withdrawn
0150-WDWithdrawnIndependent StudySolar PV52010-07-23Withdrawn
0151-WDWithdrawnIndependent StudySolar PV52010-07-23Withdrawn
1585-WDWithdrawnIndependent StudySolar PV52017-07-31Withdrawn
3770-WDWithdrawnIndependent StudySolar PV52023-12-13Withdrawn
0439-WDWithdrawnFast TrackSolar PV22011-11-04Withdrawn
4088-WDWithdrawnFast TrackSolar PV12024-09-29Withdrawn
3398-RDWithdrawnDetailed StudySolar PV02023-04-03Withdrawn

Geocode provenance

geo_method
exact
geo_score
1.00
osm_name
Gates Substation
lat, lon
36.14134, -120.12566

All metrics

metricvaluedefinition
legacy_active_mw2,521active MW in the public report (C14 and earlier)
c15_active_mw0active MW in the Cluster 15 report
operating_mw820completed MW in the public report
pipeline_storage_mw1,860storage MW inside legacy_active_mw + c15_active_mw
operating_storage_mw497storage MW inside operating_mw (completed, public report)
wd_recent_mw839withdrawn in the last 5 years (both reports)
wd_recent_storage_mw839storage MW of those rows — each project's storage components capped at its net-to-grid figure; a handful of filings report net-to-grid as 0 and keep the component MW, so this can exceed the row above at 3 nodes.
wd_post_phase2_mw1,240withdrew AFTER Phase II / Facilities Study results (public report only)
p2_reached_mw4,581MW of projects that received Phase II / Facilities Study results here (public report, any sheet)
p2_withdrawn_mw1,240of those, MW that then withdrew (== wd_post_phase2_mw)
p2_attrition0.27p2_withdrawn_mw / p2_reached_mw — share of studied MW that left with results in hand
committed_mw1,521ACTIVE MW holding an executed interconnection agreement (public report)
churn_n16projects behind storage_churn (withdrawn recent + queued + operating)
c15_n2projects behind c15_survival
p2_n15projects behind p2_attrition
eia_plants4operable EIA-860 plants within 5 km of the node's mapped position (positioned nodes only)
eia_nameplate_mw335their nameplate MW, all technologies (EIA-860 Generator file, Operable sheet)
eia_storage_mwh137battery energy capacity among them (EIA-860 Energy Storage file), as reported
eia_storage_1h_mw137storage MW at units whose reported MWh is no more than their MW (one hour or less); shown with 'duration not established' because the value may reflect how the form was filled
eia_proposed_mw300nameplate MW in EIA-860's Proposed sheet within the same radius (planned / under construction)
wd_alltime_mw5,233every withdrawn MW since 2006 (includes dead wind/solar-era projects)
storage_churn0.36wd_recent_storage_mw / (active + operating storage MW) — the one to quote
churn_alltime1.57wd_alltime_mw / (pipeline + operating MW) — historical color only
c15_survival0.00c15_active / (c15_active + c15_withdrawn)
c15_fcds_req_mw0C15 active MW that requested Full Capacity Deliverability Status (requested, not allocated)
tpd25_projects2projects at the node that sought TPD in CAISO's 2025 allocation cycle
tpd25_req_mw1,396MW at the node that sought TPD in CAISO's 2025 allocation cycle
tpd25_alloc_mw396MW allocated in that cycle (requested × allocation %)
tpd25_denied_mw1,000MW requested by rows that received 0 %
tpd25_unalloc_mw1,000requested minus allocated: MW refused outright PLUS the remainder left by partial allocations — quote this for 'what the developer did not get'
tpd25_unknown_mw0MW requested by rows with no allocation percentage in the file; 0 today
tpd25_req_A_mw396of tpd25_req_mw, requested in allocation group A: executed PPA (or LSE own load)
tpd25_req_B_mw0of tpd25_req_mw, requested in allocation group B: shortlisted / negotiating a PPA
tpd25_req_C_mw0of tpd25_req_mw, requested in allocation group C: already in commercial operation
tpd25_req_D_mw1,000of tpd25_req_mw, requested in allocation group D: no PPA, Section 8.9.2.3 path
tpd25_denied_A_mw0of tpd25_denied_mw, refused at 0 % in group A
tpd25_denied_B_mw0of tpd25_denied_mw, refused at 0 % in group B
tpd25_denied_C_mw0of tpd25_denied_mw, refused at 0 % in group C
tpd25_denied_D_mw1,000of tpd25_denied_mw, refused at 0 % in group D
tpd25_denied_ppa_mw0refused MW in groups A + B: contracted or shortlisted projects that did not get deliverability; the refusal that matters
tpd24_fcdsa_projects2projects at the node allocated Full Capacity in the 2024 cycle
lcr_statusoutside Greater FresnoCAISO Local Capacity Area (Resource Adequacy geography): 'in <area>' or 'outside <area>' as the LCT report's boundary lists state it; blank = not encoded, never 'outside every area'
lcr_sub_areasub-area / load pocket within that area, when the LCT report delineates it
wdat_active_projects1active WDAT requests at the same substation (WDAT = distribution-level queue at the same substation, PG&E file today; not CAISO deliverability)
wdat_active_mw5MW of active WDAT (distribution-level) requests at the same substation (PG&E file today)
wdat_active_storage_mw0storage MW attributed from wdat_active_mw — an assumption: the PG&E file publishes one MW figure per request, so storage-only requests count in full and solar+storage requests count at half (160 of 1,011 active requests carry storage; 362 of their 479 MW is attributed as storage).
wdat_inservice_mw33WDAT MW already in service at that substation
wdat_withdrawn_mw78WDAT MW withdrawn at that substation (all-time in the file)
wdat_ft_over_cap_n0active Fast Track requests above the 5 MW Fast Track ceiling — held out of wdat_active_*
wdat_ft_over_cap_mw0MW of those held-out rows, as posted; cause not established

No figure on this site states a cause. CAISO files carry no withdrawal reason beyond "IC Request".

Screening tool, not engineering advice. Built from public filings by an engineer who is not a licensed PE. Verify every figure against the source filing named in its row before you rely on it for any decision. No warranty of any kind. Not affiliated with CAISO, EIA, or any utility. No engineering services are offered.